General :: How To Remove Specific Status Bar Icons And Change Order Of Icon Display

Mar 18, 2013

How to remove a specific status bar icons and change the order of icon display? I think we need to edit the smali files, but I'm not sure which one to edit.

General :: how to remove specific status bar icons and change order of icon display


General :: Remove Signal Strength Icon From Status Bar

Jan 11, 2013

I'm using a Lenovo a60 phone. It has dual SIM support. However i rarely keep the second SIM card activated which results in a no-signal icon beside the 1st SIM signal icon. Anyway i can remove the NO SIGNAL icon ONLY? I still want the signal strength of the second SIM to appear when SIM 2 is activated but i don't want the icon when SIM 2 is deactivated.

I believe it lies somewhere in the SystemUI.apk since that's how i removed the Vibration Indicator icon.

How to remove the NO SIGNAL icon in the statusbar of ANY PHONE (dual sim or not).

View 9 Replies View Related

General :: Change Status Bar Icons

Aug 3, 2013

First: I have to edit the SystemUI.apk or the Framework-res.apk? (because in systemui i dont have battery icons, but yes wifi and etc); And in framework-res i have all the statusbar icons.

Second: I have to edit the .png images with patch 9.png or something?

Third: All the images to replace have to be exactly the same size of pixel? or 2 or 3 pixel more high or width doesnt matters?

View 1 Replies View Related

General :: Rom ToolBox Not Change The Status Bar Icons

Jan 14, 2013

Why Rom ToolBox does not change the status bar Icons when it shows that it's installed?

View 1 Replies View Related

General :: Change Status Bar Icons From Stock To Blue

Jan 22, 2014

So I have installed a deodexed ROM for my Samsung galaxy GT-S6312 (young duos) and I want to change the status bar icons. I am talking about [URL] .... ( the red-squared bar with battery clock etc). How do I do it? Already went for xposed mod and it didn't worked.

View 1 Replies View Related

HTC Magic :: Text Display - Change To Display The Order In Which They Were Sent And Received

Jun 26, 2010

Hello there I have a problem regarding the new HTC Magic I purchased : in my text display where I read the conversations between me and my contacts... it has all of the messages I sent in 1 group together, and all of the messages my contacts have sent together. How do I change this to display the order in which they were sent and received? For example right now it is

ME : blahblahblah
ME : blahblahblah
ME : blahblahblah

You : blahblahblah
You : blahblahblah
You : blahblahblah

View 3 Replies View Related

General :: CM10.1 Theme With White Status Bar Icons As Only Change?

Jan 28, 2013

CM10.1 or AOKP theme where the only thing that changes from stock is that the status bar icons, specifically signal, battery and wifi are white instead of Holo blue? Either that or a theme that replaces the status bar with MIUI bar icons but maintains the rest of the UI would be great as well. I tried one called HoloWhite, as well as a couple other minimalistic ones, but with those some of the icon styles changed.

View 7 Replies View Related

General :: Status Bar Signal Icon Change

Jun 13, 2012

I made some changes to the status bar and for the most part it went smooth other than the signal icon. I have a D3 with the Eclipse 3 rom. I used Ninjamorph went into framework , apps, systemui.apk and changed the png files of the signal bar png's. when I reboot the new image shows up but changes back to the old style when the 3g or 1x kicks in. do I need to change a different signal png?

View 2 Replies View Related

General :: Change MIUI V4 WiFi Icon In Status Bar?

Aug 13, 2012

Is there a way to change MIUI V4's wifi icon in the status bar? I know you can use StatusBar themes but all I want to do is change the WIFI icon to cm9/ics's stock one, rather than theming the whole bar/notification drawer. GT-I9100

View 1 Replies View Related

General :: How To Change All Icons In Whole System With Icon Pack

Apr 20, 2014

I well know Unicon which allow to change all the icons in the whole system with a icon pack

Looking for something similar but to mod only a few apps

View 3 Replies View Related

HTC Incredible : Change Order Of Notification Icons

May 18, 2010

Is there a way to change the order that the notification icons come up? i ask because i have the battery indicator installed and running as an ongoing event in the notification bar, so i'd like to keep that in the corner and have the other notifications come up to the right of it...but as of now it's putting new notifications in the corner and moving the battery indicator to the right...

View 1 Replies View Related

Android :: How To Display Icon On Status Bar?

Mar 8, 2010

I want to create an icon on the status bar without the notification message. Is it possible to create an icon on the status bar without having the notification message? I just want to display the icon and not to allow the user to click on it display the any message.

View 5 Replies View Related

Android : How To Hide / Remove Icons From Notification / Status Bar?

Nov 19, 2010

I've looked all over the forum, but don't see any recent posts for my question. So I'm hoping someone can help... I would like to hide or remove unwanted icons from the left side of the notification/status bar. I realize most programs give you this option, but some don't (such as the latest version of Norton security program). It just sits up there and hogs up real estate. Ideally, it would also be nice to be able to rearrange the icons, or make them larger if desired..

View 1 Replies View Related

HTC Desire :: Better Cut And Folder Organiser In Order To Change Icons

Jun 30, 2010

I have tried using Better Cut and Folder Organiser in order to change the icons on my HTC Desire. However, when I try and do this for Messaging, Email or People application, it always reverts back to the standard HTC icon.

How have other people got round this? Or is this just a problem I am experiencing? I am un-rooted.

View 4 Replies View Related

Android :: Remove Notification Icon From Status Bar

May 15, 2010

I am displaying an icon in status bar.Now i want to remove that icon immediately when i open that content , after some time if we receive any alert ,that icon will be displayed again.For this what can i do?

View 1 Replies View Related

LG Ally :: Change Status Bar Icons On Desktop?

Nov 15, 2010

lg ally stock rom with dxtop. is there a way to change status bar icons on desktop, if not how do i do it by keeping stock rom?

View 1 Replies View Related

HTC Incredible :: Icon Thread - Apps That Allow To Change Icons

Aug 26, 2010

Ok, so I have been seeing a bunch of requests for black and red icon packs. Since we have a wallpaper thread, why not an icon thread? For any colors, shapes, whatever. Post your icons, or a link you your favorite icon pack be it on deviant art or an app in the market or anywhere else.

Here are some apps that will allow you to change icons. If you PM me or post others here, I will try to keep up and add them.

BetterCut allows you to change icons LauncherPro allows changing icons on its dock
There are numerous apps out there like Fake Chrome that will change one specific icon for a specific program.

View 14 Replies View Related

HTC Droid Eris :: Change Icon Appearances With BetterCut - Rearrange Icons / Widgets

Apr 18, 2010

I just got to thinking and I realized that I change my layout each week, sometimes more then once in a week. I don't just mean add an icon or widget, i mean change icon appearances with BetterCut, rearrange icons/widgets...add/remove the amount of screens, change background images and lockscreens.....you get the point. so with that being said, how often do you change your eris layout???

View 6 Replies View Related

Motorola Droid : Handcent Icon To Change Icons Color / Replace It With Stock

Aug 18, 2010

Anybody have the stock Handcent icon or original droid messaging icon so I can change the Handcent icons color or replace it with the stock icon I use to use?

View 19 Replies View Related

Motorola Droid :: Any Way To Change / Remove Icon Labels?

Nov 15, 2009

Is there a way to change or remove the naming of the icons on my phone? Or is there a way to change the icon pictures?

View 8 Replies View Related

General :: How To Modify Icon Order (flyout Menu From The Top)

May 27, 2014

I want to change icon order. Is it possible? How can I do it?

look ScreenShot:

My phone: Samsung Galaxy Trend, GT-S7560:

View 3 Replies View Related

General :: Move Status Bar Icons?

Mar 22, 2013

how to move my status bar icons i.e. my signal bar in middle, time on left side, battery on left side n etc.

View 3 Replies View Related

General :: Animated Icons In Status Bar

Sep 1, 2013

I'd like to accomplish getting animated icons into the status bar of newer devices Android 4.2+, but don't really know where to start and don't have any real development behind me here.

Having an animated icons in status bar is something not many people have thought up and it's great for customization!

How to get started on this project, and I know it can be accomplished, the PacRom

Team has a USB debugging icon that is fully animated, I have been in contact and am making a little progress here and there.

View 7 Replies View Related

General :: Hide Specific Icon In Statusbar?

May 15, 2014

i need to hide an icon from statusbar, is there any app that can hide specific icon from statusbar?? but i dont want to close the app which icon i want hide.

View 1 Replies View Related

General :: Hide Permanent Icons In Status Bar

Jul 30, 2012

Is there a way to hide permanent notification icons in the staus bar, like the Juice Defender Icon, Lux, App Clip, and etc? These take up room for the regular notification.

View 1 Replies View Related

General :: How To Make Status Bar Icons Opaque On ICS ROM

Feb 27, 2014

I'm trying to make the status bar icons opaque on an ics Rom (the icons to the left, like the debugging, usb, unread notifications, etc.) as in kitkat roms. What values should i change? I'm sure it's not on drawables.xml and it's not the png's either (they are already opaque). Statusbar.smali maybe? if that's the case, what are the lines that i should modify?

Here, some screenshots:

View 1 Replies View Related

General :: White Status Icons In KitKat Upgrade

Mar 13, 2014

How to get back the Status Icons back to colour?

GT-I9505

View 5 Replies View Related

HTC Incredible :: Change Email Notification To Specific Sound / Select A Specific Ring For Mms?

May 31, 2010

Just picked up my incredible, and I have two questions....

1. how do i change the email notification to a specific sound? As of rite now, when i receive an email nothing happens (no sound or vibrate).

2. How do I select a specific ring for mms. I know how to select sms, but I cant figure out how to change the mms.

View 3 Replies View Related

General :: Force Stopping Specific App Via Icon On Home Screen?

Jul 5, 2013

I've thought there might be a shell script I could run, maybe get an app that can run shell scripts from an icon on the home screen--but I don't know what that script would need to be, since it couldn't be about killing a process because that process ID is probably going to be different every time, and I don't know if it would require root. Rooting my phone is not an option.

I'm going to assume though that there's probably no answer to this and that I'll just have to keep going in by hand to force stop the app via prefs/apps/name-of-app/force stop. I just wish these app makers would have an exit option. Twitter and Vine and Growlr are examples of these programs with this kind of behavior. Facebook as well, but that'll just reload itself when you force quit it because it's a special "system app". I mean, I'm not expecting them to exit when I just go to the home screen, that would be silly, but I'd like SOME sort of option to close them besides going through the hassle of force stopping them via the OS preferences.

I want there to be NO chance whatsoever that these programs are going to access data in some way once I'm done using them. I have no problem with whatever the programs want to do when I WANT them running, but when I'm done using them, I want to be able to quit them, and it has nothing to do with wanting to have more free memory.

View 1 Replies View Related

General :: How To Hide 3G Icon In Status Bar

Sep 23, 2013

I'm rooted and have 4.0.4.

View 6 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved