HTC Incredible : Change Order Of Notification Icons

May 18, 2010

Is there a way to change the order that the notification icons come up? i ask because i have the battery indicator installed and running as an ongoing event in the notification bar, so i'd like to keep that in the corner and have the other notifications come up to the right of it...but as of now it's putting new notifications in the corner and moving the battery indicator to the right...

HTC Incredible : change order of notification icons


HTC Desire :: Better Cut And Folder Organiser In Order To Change Icons

Jun 30, 2010

I have tried using Better Cut and Folder Organiser in order to change the icons on my HTC Desire. However, when I try and do this for Messaging, Email or People application, it always reverts back to the standard HTC icon.

How have other people got round this? Or is this just a problem I am experiencing? I am un-rooted.

View 4 Replies View Related

General :: How To Remove Specific Status Bar Icons And Change Order Of Icon Display

Mar 18, 2013

How to remove a specific status bar icons and change the order of icon display? I think we need to edit the smali files, but I'm not sure which one to edit.

View 2 Replies View Related

HTC Incredible :: Arrange Icons In App Drawer In Order Of Installation Date?

Oct 13, 2010

This forum is the best, Is there a way that I could arrange the icons in the app drawer in order of installation date? I'm running Virtuous 3.0.1

View 2 Replies View Related

HTC Incredible : Change Phone Icons Like Camera / Photos To Stock Droid Icons?

May 13, 2010

Is there a way to change the HTC Icons like camera, photos to the stock Android Icons?

View 5 Replies View Related

HTC Desire :: Change Icons On Notification Bar To Different Colors?

Sep 26, 2010

Can anybody tell me how I can change the icons on the notification bar to different colors if WiFi to blue or network to orange etc.

View 4 Replies View Related

Motorola Droid X :: Way To Change Icons On Notification Bar Manually?

Oct 31, 2010

Is there a way to change the icons on the notification bar manually? so i can pick and choose which ones to install?

View 1 Replies View Related

HTC Incredible :: Colored Notification Icons?

Oct 28, 2010

Can anyone help me out on getting color icons onto my Rooted Froyo (stock) deodexed with S-off. Specifically Gmail, Gtalk, Mail and Messages? The Gtalk one I do not have the right size or transparent.

View 11 Replies View Related

HTC Incredible : Way To Customizing Notification Bar Icons?

Aug 18, 2010

Anyone know of a tutorial for this? Ide like to change up the icons on my thirdwave notification bar.

View 5 Replies View Related

HTC Incredible :: Key To Show Icons That Displayed In Notification Bar?

Jun 9, 2010

Probably a dumb question, but is there an app, or even a document that shows all the possible icons that displayed in the notification bar? With so many, it's sometimes difficult to remember what they all are and it would be helpful to have a reference.

View 1 Replies View Related

HTC Incredible :: Change Icons For Folders

Jul 2, 2010

If you are still using the Sense UI, is there a way to change the icons on Folders? For example I want to have a folder with a bunch of direct dials in it and would like an appropriate picture for it, like a little telephone or something.

View 5 Replies View Related

HTC Incredible :: How To Change Folder Icons?

Jun 30, 2010

I searched the net on how to change folder icons but i cant figure out how except for this app that actually creates a folder and if you want to edit the folder you have to use the app, not really what I'm looking to do cuz i already have folders i just want to change the icon.

View 7 Replies View Related

HTC Incredible :: Change Icons On Screens

Sep 6, 2010

Is there a way to change the icons on your screens? Do you have to root your phone in order to do this?

View 5 Replies View Related

HTC Incredible : Inbox Notification Icons - Way To Turn Off Black Envelope?

Jun 18, 2010

I couldn't find anything specific through a search, but whenever I get an email on gmail I get a white envelope notification. That is linked to the gmail folder. At the same time I get a black envelope with a white outline. I cannot figure out what email folder/widget/whatever it is linked to and I have to manually clear the notification.

Is there anyway to turn off the black envelope?

View 3 Replies View Related

HTC Incredible :: Icon Thread - Apps That Allow To Change Icons

Aug 26, 2010

Ok, so I have been seeing a bunch of requests for black and red icon packs. Since we have a wallpaper thread, why not an icon thread? For any colors, shapes, whatever. Post your icons, or a link you your favorite icon pack be it on deviant art or an app in the market or anywhere else.

Here are some apps that will allow you to change icons. If you PM me or post others here, I will try to keep up and add them.

BetterCut allows you to change icons LauncherPro allows changing icons on its dock
There are numerous apps out there like Fake Chrome that will change one specific icon for a specific program.

View 14 Replies View Related

Samsung Captivate :: Instant Message - Change Icons With Different Icons

Nov 25, 2010

I notice that the home screen is customizable but not the four applications on the bottom, the call, email, browser and applications. How would I change those icons with different icons? Mainly the email and browser. How do I turn off or at least severly limit the data that goes to and from my phone. I do not have wireless and am just a bit paranoid about going over my data limit. I got the phone from work and this is my first smartphone so I am a bit nervous about anything I do on it.

View 3 Replies View Related

Android :: Sets Of Notification Icons Based On Notification Bar Color

Sep 27, 2010

I am displaying a notification icon which is dark gray. It looks fine on Nexus One, where the notification area is light gray and is almost invisible on HTC Desire (Sense UI - dark gray notification bar). Is there a way to overcome that? (The icon cannot be changed).The icon cannot be changed meaning" that I am using a custom set of icons which is a must for me.

View 1 Replies View Related

Android :: Way To Use Different Email Notification Icons In HTC Magic Notification Bar?

Nov 25, 2009

Is there a way to use different email notification icons in the HTC Magic notification bar?I am tired of the stupid "@" sign when I receive a new email in Gmail.

View 1 Replies View Related

HTC Incredible :: Want To Change LED Notification With Handcent?

May 20, 2010

I did a quick search and didn't find anything, but if this has been answered I apologize. I just switched from the droid, and was used to having all the different LED colors that I could use for different groups of people. Is this not possible on the Incredible? That would really suck.

View 1 Replies View Related

HTC Incredible : Can't Change Notification Sound

Aug 9, 2010

I can't change my text notification sounds. If I change my sounds it only works on emails, not text.

View 13 Replies View Related

HTC Incredible :: How To Change Voicemail Notification Ringtone?

May 10, 2010

Right now my Voicemail Notification ringtone is the same as my text message ringtone, how do I change it? I don't want them to be the same.

View 3 Replies View Related

HTC Incredible :: Cannot Change Voicemail Notification Sound

May 23, 2010

I cannot change the voicemail notification sound. I go to messages ->settings scroll down to voicemail notification setting and then change the notification sound. But for some reason when I get a voicemail it plays a sound that I selected as notification sound in Sound & Display setting. The same sound that is used for email notification.

View 1 Replies View Related

HTC Incredible :: How To Change Notification Bar Font Color?

Nov 1, 2010

How do you change the notification font color? I want a 255 0 0 red font.

View 6 Replies View Related

HTC Incredible :: How To Change Mail Notification Sound?

May 24, 2010

I can change my default notification sound for all my notifications, but I can't seem to figure out how to change it so my mail notification has a unique sound from my text. Is there a way to do it?

View 7 Replies View Related

HTC Incredible :: How Do I Change Voice Mail Notification Sound?

May 21, 2010

I got a great vm notification sound I'd like to use but can't figure out how to assign it to play for vm only.Can someone please point me in the right direction?

View 7 Replies View Related

HTC Incredible :: Way To Change Label Specific Notification Sound?

Sep 22, 2010

Is there a way to have label (or even sender) specific notification new e-mail sounds? I have several filters set up on my gmail account to automatically label and star emails from certain senders. Is there a way to have items labeled "Work" chirp with a different notification sound than other emails?

View 1 Replies View Related

HTC Incredible : Set To A Single Vibrate - Change The Color Of The LED Notification

Jun 18, 2010

Is there a way for me to set vibrate to a single vibrate (instead of two) and even change the color of the LED notification on my phone for SMS without downloading SMS Chomp or Handcent?

Any other app will do...

I miss the BlackBerry Led notifications....

I also tried Missed reminder....didnt work...

View 6 Replies View Related

HTC EVO 4G :: Change The Order Of The Bookmarks?

Jun 10, 2010

I am using the bookmarks widget, list view. I like it but would like to change the order the bookmarks appear. I did not any options for doing so. Is there a way to do this?

View 5 Replies View Related

HTC Desire :: Predictive Text - Change In Order

Oct 2, 2010

I do like using the predictive text on my desire, i find it much easier, one question i have though, is there anyway to change the order in which the phone gives suggestions, so if it always predicts a certain word as the 2nd option, is there anyway to make that word always the first option? for instance if i type they, which i do a lot, view always is the first option, it would be so much more useful for me to be able to set certain words as the first prediction.

View 4 Replies View Related

HTC Desire :: Change Order Of Contact Names

Jul 13, 2010

Just got a HTC Desire. Is it possible to change the order of the contacts name in "People"?I'd prefer to have first name and then last name instead of last name and then first name.

View 1 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved