Creating Android Calendar - Month / Week / Day View

Sep 4, 2012

Can I have some tutorial to create simple android calendar? How to show month view, week view, day view, and create activity.

Creating Android Calendar - Month / Week / Day view


Samsung Moment :: How To Go To Next / Previous Day / Week / Month When In Each View?

Nov 19, 2009

I was just reading in another of the forums here that the HTC Hero calendar does not have a week view. This led me to the Samsung manual (I don't own the phone) to confirm that it does have a week view (*phew*). My question is: How do you go to the next/previous day/week/month when you're in each view? Is it a simple one-click or swipe operation (like in Palm OS), or do you have to back out to, say, month view and drill in again (like, apparently, on the HTC Hero)?

View 5 Replies View Related

Android :: Displaying Calendar In Month View?

Feb 7, 2010

I just wanna know is it possible to display the Calendar in the month view using the api available. i am searching for while dint find anything to display the calendar in the Month view . kindly help and let me know is this possible using android sdk1.5 or 1.6 or even 2.0. If not what would be the procedure to generate month view and highlighting the present date.

View 2 Replies View Related

Android : How To Get First Day Of Current Week - Month

May 30, 2010

I have the date of several events expressed in milliseconds*, and I want to know which events are inside the current week and the current month, but I can't figure out how to obtain the first day (day/month/year) of the running week and convert it to milliseconds, the same for the first day of the month.

*Since January 1, 1970, 00:00:00 GMT

View 4 Replies View Related

HTC Incredible :: How To Get Texts For Events To Appear In Calendar Week View?

May 6, 2010

Does anyone know how to get the texts for events to appear in the Calendar week view? It has a picture of it in the manual but nothing about how to do it. My Incred currently just shoes the color of the event (red for business etc) and I want to see what the events are! I have tried experimenting with the length of the title and that makes no difference. Any thoughts?

View 9 Replies View Related

Android : Where Can I Find Top Downloaded Apps For A Week - Month

Jul 22, 2010

I see these news postings of swiftkey being teh top downloaded app for last week, but where do regular users get to see this?

View 2 Replies View Related

Motorola Droid X :: Month Calendar View On Phone?

Jul 17, 2010

Is there anyway to set the month as your default calendar view? I don't care to see what's happening on a current day. I'd rather see the whole month instead!

View 8 Replies View Related

Motorola Droid :: Calendar Month View On Phone?

Jun 18, 2010

I searched the forums and I even tried Google, however, I can't seem to find a fix for my calendar. Every time I view my calendar it shows up in agenda view and I can't get it to stay in month view which is the only way I would like to view it, does anyone know how to correct this?

View 3 Replies View Related

HTC Incredible :: LauncherPro - How To Get Full Month View Calendar?

Aug 8, 2010

I've just started experimenting with LauncherPro. Question: How do I get a full month-view calendar to show up, instead of just one event?

View 9 Replies View Related

Motorola Droid X :: Need A Calendar Widget With Full Month View?

Sep 10, 2010

If I'm just not doing something right or what. I had my calendar on the Eris that took up one of my screens with a monthly view and cannot seem to find it on my DX, Can anyone lead me in the right direction or suggest an app for that.

View 11 Replies View Related

Motorola Droid X :: Calendar Widget Show Month View?

Jul 18, 2010

Anyone figure out how to make it show the month view.

View 8 Replies View Related

Motorola Droid :: Need Calendar Application Show Text In Month View?

Nov 14, 2009

Is anyone aware of an app that will show me my calendar with text in the month view? Every app I've tried only shows weather there is an appointment on that day or not, but no text. I'd like to look at my month view and see specifically what I have scheduled on that day. In landscape mode you would think that would be easy to do.

View 16 Replies View Related

Android :: Need To See Week Number In Calendar

Aug 10, 2010

I need to see the week number in the calendar, like we are in week 32 now? Is this possible with the stock calendar on Hero 2.1? Or do I need a new calendar app? If so which one do you suggest?

View 4 Replies View Related

HTC EVO 4G :: Calendar Won't Show Day Of Week

Nov 15, 2010

When I open my calendar it only shows me (example) 11/15/10 when I put in a new event. It wont show me the DAY of the week (example) Monday. This is a huge issue because when I go to change an event or add an event I need to see the actual DAY and not just the date.

View 1 Replies View Related

Android :: Need A Full Month Calendar Selector Control?

Aug 4, 2010

I want to incorporate a full month calendar selector like that of an IOS into my program. The one like this: However, it seem no one have come up with a control like that. Can i create a custom control like this and if yes, what is the best views to use for each date? a button view or a text view?

View 1 Replies View Related

Android :: Best Full Month Calendar Widget For Busy Person?

Jun 10, 2010

I am trying to find out what calendar to use on my home screen. I have the standard calendar widget enabled right now, but it's useless. It tells me I have something scheduled on each day, but that's it. The actual calendar app on my Incredible gives me kind of a bubble indicator for each day that is filled at different spots, depending on whether I have something set up for earlier in the day, middle of the day, etc. I want a full page widget that will do this, just having a marker that says that I have something on that day does me no good. I've also checked out some of the apps so far like Pure Calendar and while they are neat, they tend to tell me only a few days. I want the whole month laid out for me, so I can tell at a glance how busy any particular day will be. BTW, for anyone also wanting a widget with a layout on a day-to-day setup, check out Android Agenda, I use that for a text-based to-do list and it rocks, I just want a graphical one as well. I have stuff going on every day, but some are only 1 or 2 events, so the graphic layout is nice.

View 10 Replies View Related

General :: Calendar Only Shows One Week Future Appointments After 4.2 Update

Sep 4, 2013

Updated to 4.2 yesterday which is great.

But, on one of my panels I have a Calendar widget showing my future appointments. Since the update it only shows one week ahead where as before it showed about 2 months.

Is there a way to get it to show 2 months again?

View 3 Replies View Related

Samsung Epic 4G :: Need Calendar App That Shows Event Details In Week Mode

Sep 10, 2010

The default calendar app seems okay, but I like to see the event details, even if it's just 2 words in the "time box" in week view. I understand it can't do it for month view. It does it in the "day" view (when not in list) but I was curious if there was a better calendar app out on the market that did this?

View 1 Replies View Related

HTC Desire :: Need "Calendar Month" Style Date Picker?

Nov 15, 2010

One thing annoys me; The date picking facility that seems to be built into the OS is pretty poor. The three scrolling wheels for year, month and date make it slow to use, and also difficult to work out what date to select if you want something that is, say, 1 week away from today (especially if that leads into another month). It would be better to have a "calendar month" style picker, where you can see an entire month in one go, and switch forwards/backwards a month. Does anyone know if it's possible to change this? Perhaps an app can be installed to replace the standard picker?

View 1 Replies View Related

Android :: Creating A WebView In The Top Of A View

Aug 2, 2010

I'm trying to do a fairly simple thing but i'm failing since 3 hours.

I have a WebView that i show with some pictures and html stored in local sdcard. After the user clicks a button in my app, i want to show the webview, and when he press the back button, i want to return to the previous view (which is my main app view).

How to do it? I tried this:

CODE:.............

However, when i press back, my app quits.

View 5 Replies View Related

Creating A Calendar Layout

Oct 8, 2011

I'm starting a calendar app and I'm trying to figure out what the best way to create the layout is. I don't want to use the built in CalendarView as it's only in API >11 which limits the potential users too much.

I've toyed around with a GridView with and Adapter behind it. Truth be told I'm still figuring out how that one works, but it seems the most promising.I tried a nested LinearLayout of TextViews but that requires accessing each TextView be it's ID.

View 8 Replies View Related

Android :: Creating Diamond Shape View Using 2D Or 3D

Nov 22, 2010

how can we create diamond shape view using 2D or 3D,I need to show the Images in that customized view instead of default ImageView class

View 2 Replies View Related

Android :: Creating View With Particular Style Programmatically

Jun 1, 2010

Other questions say that the style cannot be set programmatically, but a View can be initialised with a style such as when it is loaded from XML.How can I initialise a View with a particular style programmaticly (not in XML)? I tried using View(Context context, AttributeSet attrs, int defStyle), but I don't know what to parse in for the second argument. Passing in null results in the View not being displayed

View 1 Replies View Related

Android :: Creating Own View Type From Layout File?

Mar 9, 2010

not sure how to inflate this from my layout file: MyView v = LayoutInflater.from(this).inflate(R.layout.myview, null); the inflater of course does not know what 'MyView' type is, and returns only View. What's a good way to reconcile this?

View 1 Replies View Related

Android :: Creating Multiple Objects Of View Defined In Xml

Jun 9, 2010

I have to dynamically add a list of views (the views use RelativeLayout). Can I do this by specifying the view definition in xml and instantiate multiple objects off it? This gives the usual benefits of separating the view part from the code (for e.g., making it easy for the UI guys to alter things) or Is going the ArrayAdapter the suggested/only route?

View 1 Replies View Related

Android :: Creating And Showing A View/window From A Service

May 22, 2009

I want to show a view on calling a Service API. Currently the only way looks like using the Toast class.

I tried the following after getting the WindowManager service, but it crashes at addView. I looked into the Toast class and found that it uses WindowManagerImpl which is not accessible publicly - is there any way to access the WindowManagerImpl functionality?

CODE:.................

View 4 Replies View Related

HTC Droid Eris :: Creating Events In Calendar

Apr 12, 2010

So I have finally synced my Ical with googles calendar, and google with Ical. But my question is if i want to create and event in calendar, but I have 4 calendars on google. How can I choose those asides from the default that shows up on the phone?

View 2 Replies View Related

HTC Droid Eris :: Calendar Now Creating Events For Weather

Oct 6, 2010

I just reset my phone (while rooting and installing xtrSENSE). I'm now noticing that there are calendar events being created for the weather forecast of the upcoming 4-5 day. This never happened before.I have the calendar settings set to show the weather on the calendar view, but this just puts the weather in the bottom of the window. I like this.I also have weather set to sync in the sync settings, but I'm assuming this is for the weather widget on the home screen which I also like using.I don't like seeing all of the days showing events when there really aren't any.

View 2 Replies View Related

Motorola Droid :: Creating Calendar Event - Range Not Available?

Jan 3, 2010

When creating an event on Google Calendar (on the web), the option to add a repeating "range" is available. For example, you can setup an event that repeats weekly. But you can also say that the event should stop at a certain date, therefore creating a range.

I created a repeating an event from Google Calendar on my Droid, however, and the range was not an option, so I had to go to the web version later and set that from there. Did I miss someting or is that option actually not available on the Android version of Google Calendar?

View 1 Replies View Related

Android :: Extracting Activity Code And Creating Graph View Class

Mar 1, 2010

I had a bunch of code in an activity that displays a running graph of some external data. As the activity code was getting kind of cluttered, I decided to extract this code and create a GraphView class:

public class GraphView extends LinearLayout {
public GraphView(Context context, AttributeSet attrs) {
super(context, attrs);
LayoutInflater inflater = (LayoutInflater)
context.getSystemService(Context.LAYOUT_INFLATER_SERVICE);
inflater.inflate(R.layout.graph_view, this, true);
}
public void start() {
// Perform initialization (bindings, timers, etc) here
}
public void stop() {
// Unbind, destroy timers, } }

Moving stuff into this new LinearLayout-derived class was simple. But there was some lifecycle management code associated with creating and destroying timers and event listeners used by this graph (I didn't want this thing polling in the background if the activity was paused, for example). Coming from a MS Windows background, I kind of expected to find overridable onCreate() and onDestroy() methods or something similar, but I haven't found anything of the sort in LinearLayout (or any of its inherited members). Having to leave all of this initialization code in the Activity, and then having to pass it into the view seemed like it defeated the original purpose of encapsulating all of this code into a reusable view. I ended up adding two additional public methods to my view: start() and stop(). I make these calls from the activity's onResume() and onPause() methods respectively. This seems to work, but it feels like I'm using duct tape here. Does anyone know how this is typically done?

View 4 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved